Construction of the the two wind turbines
The two UGE VisionAIR5 vertical axis wind turbines were specially painted to match the iconic tower, and are located 400 feet above ground level to maximize energy production. Mounting the turbines at this location was in itself a technical challenge, requiring each component to be hoisted individually and suspended with rope above the tower’s second level.